Electrical Directory

FAQ: Domestic Solar

Q. what is the approximate weight of solar panel for 1 squar...

Q. what is the approximate weight of solar panel for 1 square meter?

The approximate weight of solar panels is approximately 13kgs/m². This weight is too heavy for asbestos roofed sheds, which requires to check proper strengthening for roof.

Q. How much area required to install 1Kw solar panels?

Q. How much area required to install 1Kw solar panels?

At typical 16% panel efficiency, 1kw solar panel occupies approx. 100 sq.ft. However, if panel efficiency increases required space will be decreases proportionally.

Q. Do I need plan permission from the Municipal Authorities?...

Q. Do I need plan permission from the Municipal Authorities?

The roof mounted systems do not need any permission. 

Q. Where shall I contact for subsidies?

Q. Where shall I contact for subsidies?

Please contact the NREDCAP for AP and TGNREDC for Telengana office addresses shown below for the subsidies:

Regd.Office:5-8-207/2, Pisgah Complex, Nampally, Hyderabad - 500 001.

Tel. off: +91-40-23202391 Fax: 040-23201666,

Email: info@nedcap.gov.in, nedcap@ap.nic.in. 

Q. What are the cost economics of solar roof top system with...

Q. What are the cost economics of solar roof top system with net metering?

Cost Economics

Q. Explanation about net metering through a Schematic diagra...

Q. Explanation about net metering through a Schematic diagram?

Schematic diagram

  1. Solar PV modules are connected to the protection devices
  2. From protection devises to junction box where all the cable from the solar panel are combined and a positive and negative cables are taken and connected to the inverter
  3. AN inverter is used to invert from DC to AC and then fed into the isolation transformer
  4. From the transformer power is fed into  the solar  Energy meter to calculate the amount of solar power generated
  5. From the solar energy meter to the building power is supplied through interconnection port
  6. From the interconnection port an automatic relay and  bi directional energy meter  is connected from there to the grid
  7. If more amount of energy is generated then it is exported to the grid
  8. Bi directional energy meter is used to measure the amount of power imported or exported through grid.

Q. Am I entitled to pay minimum monthly charges even if no e...

Q. Am I entitled to pay minimum monthly charges even if no electricity is consumed?

Yes. The consumer have to pay minimum charges every month as prescribed in retail supply tariff & general terms and conditions of supply, even if no electricity is been consumed.

Q. Can I re-sale the electricity generated under the agreeme...

Q. Can I re-sale the electricity generated under the agreement?

No. The consumer shall not sell the electricity generated under this agreement. 

Q. What is the validity of the agreement?

Q. What is the validity of the agreement?

The agreement will be in a force for a period of 20 years from the date of commencement of the agreement. DISCOM/Consumer has right to terminate the agreement upon 1 month prior notice. 

Q. Should we notify the changes made to the solar generator ...

Q. Should we notify the changes made to the solar generator to DISCOM personnel?

The customer should submit in writing describing the modifications/changes prior to making modifications or changes. The DISCOM shall review and respond within 45 calendar days of receipt of the customer’s proposal.

Q. Are there any technical standards for various components ...

Q. Are there any technical standards for various components of the system?

Yes. The various components of solar rooftop system shall meet the requirements of IEC/IS standards and also confirm to technical standards specified by MNRE/TRANSCO/DISCOMs. The documentary evidence of the same shall be furnished to the respective DE (Operations) before commencing the plant in to operation.

Q. What guarantees will I receive?

Q. What guarantees will I receive?

As per the MNRE guidelines, the solar roof top system shall be guaranteed for 90% of the output performance for (0 – 10) years and 80% for (11 – 20) years by the vendor.

Q. What is Net meter?

Q. What is Net meter?

A meter, which is having the feature of recording both import and export values besides other parameters, notified by CEA metering regulations and (respective) TRANSCO/DISCOMs procedures in vogue. The meter is also allowed for arriving net energy for the billing period.

 

Q. Who will be the nodal agency for the subsidy?

Q. Who will be the nodal agency for the subsidy?

NEDCAP for Andhra Pradesh & TGNREDC for Telangana are the nodal agencies for release of both MNRE and Govt., subsidy.

Q. When can I get the subsidy amount?

Q. When can I get the subsidy amount?

At the time of paying amount to the vendor, the subsidized amount will be deducted and paid to the vendor.

Q. How is the subsidy amount cleared to the vendors?

Q. How is the subsidy amount cleared to the vendors?

Net metering bills raised by DISCOM for the first 2 months since installation should be produced by the vendor for the release of subsidy. These bills should be countersigned by concerned DE (Operations) and respective District Manager of NEDCAP (AP)/TGNREDC (Telangana). Subsidy payments shall be cleared within 15 working days of receipt of such bills.

Q.What subsidies I can avail from the governments of AP & Te...

Q.What subsidies I can avail from the governments of AP & Telangana?

The subsidies by MNRE, respective state governments and any other subsidy relevant to Solar Panel based on net metering turnkey solution. The consumer has to pay only the remaining amount after deducting the subsidized amount.

 For example, for a solution costing Rs.100, if 30% from MNRE and 20% from respective state Govts subsidy is being availed, then the vendor should charge consumer only Rs.50 for installing the solution. Vendor should claim subsidy component from NEDCAP for AP state/TGNREDC for Telangana.

 

Q. How is the billing and payment done for the Net import or...

Q. How is the billing and payment done for the Net import or export?

  1. The consumer shall receive a net import/export bill indicating either net export to the grid or net import from the grid.
  2. In case of net import bill, consumer shall pay as per retail supply tariff to the concerned DISCOM. If it is a net export bill, then credit amount shall be carry forward to next month for adjustment against next month import bill.
  3. No interest will be payable on this credit forward amount. Net credit available in his account will be refunded twice in a year based on June and December Month bills of each year.
  4. Net Credit amount payable will be deposited by respective DISCOM in consumer’s bank account bearing a/c number provided by consumer at the stage of application, by June and December month end as the case may be.
  5. The amount payable for net export of energy will be based on APERC pooled cost which will be effective from date of establishment of plant to 7 years in accordance with the Govt., policy.

Q. Who is the nodal point of contact for solar net metering ...

Q. Who is the nodal point of contact for solar net metering program?

The nodal point of contact for solar net metering program shall be the local Divisional Engineer (Operations). The consumer can download solar net metering rooftop application from official websites of respective DISCOMs and submit the filled in application to the concerned Divisional Engineer/ Operation/ DISCOMs.

Q. How is the power import or export calculated?

Q. How is the power import or export calculated?

The net power import or export is calculated by a single “bi-directional meter” which is also called as NET METER.

Q. Can I go for solar roof top system without net metering?

Q. Can I go for solar roof top system without net metering?

You can go for solar roof top system without net metering but you may not avail subsidies from the government. The energy produced from this system can be stored in batteries and used for own purpose.

Q. What are the subsidies provided by the state governments ...

Q. What are the subsidies provided by the state governments of AP & Telengana?

The AP & Telangana states governments will provide 20% subsidy for installation of roof top system upto 3KW capacity in domestic sector. This is in addition to Central Financial Assistance (CFA).

Q. What is the capacity limit to avail Central Financial ass...

Q. What is the capacity limit to avail Central Financial assistance by MNRE?

For domestic use, Central Financial Assistance upto 30% of the system cost will be provided by MNRE for a plant usage upto 500 KWp capacity.

Q. Is any operation and maintenance required for roof top so...

Q. Is any operation and maintenance required for roof top solar plants?

As there are no moving parts in the system, it requires only minimal attention. However, depending upon the dust accumalation, the system requires periodic cleaning.

 

Q. What is the output generated from a roof top solar system...

Q. What is the output generated from a roof top solar system generate?

For every KWp power installed on a South facing roof, the system may generate a minimum of 1000 to 1200 units in a year. This reduces by around 20% for an East or West facing roof.

 

Q. What are the safety & security features considered for so...

Q. What are the safety & security features considered for solar PV system?

Mandatory safety precautions & features which shall be installed as part of rooftop solar system are:

  1. Certified Inverter controlled relays which can trip on grid failure and thus prevent any solar power injection to grid when there is no power in grid (Islanding of SPV generators)
  2. Solar Circuit should be separately grounded/ earthed.
  3. Additional switchgear/relay (sensing phase-angle shift) required as a second rung of safety. It shall be positioned between interconnection point and the bidirectional meter.
  4. Harmonics suppression/Filtering feature in the inverter for local network’s safety and for accurate measurement of energy.

The ‘Islanding of SPV generators’ feature have to be checked for its healthiness twice in a year. An insurance cover of Rs. 5,00,000/- per annum is to be provided by the consumer to meet the expenditure arise due to failure of protection system.

Q. What are all the equipments to be installed by the vendor...

Q. What are all the equipments to be installed by the vendors in a turnkey approach?

Entire circuitry including panels, inverter, CTs, PTs, bi-directional meters, cabling, manual switch, safety circuit breaker etc, will be installed by the vendor under a turnkey approach.

 

Q. Can pre-existing roof top solar PV projects avail net met...

Q. Can pre-existing roof top solar PV projects avail net metering facility?

Yes. Pre-existing roof top solar PV projects with or without battery support can avail net metering facility. 

Q. Who are the approved vendors for executing the turnkey so...

Q. Who are the approved vendors for executing the turnkey solution?

The vendors executing the turnkey solution should be a channel partner of Ministry of New and Renewable Energy (MNRE) or manufacturer/supplier/system integrator approved by NREDCAP.

Q. How is the application approved for installing Solar Net ...

Q. How is the application approved for installing Solar Net Metering by the DISCOM?

DISCOMs shall accord approvals on a first come first serve basis for Solar Net Metering till the Solar installed Capacity reaches 50% of the closest upstream Distribution Transformer’s (DTR) rated capacity. After reaching this limit, the capacity of DTR shall be enhanced within next 45 working days to process remaining application from other consumers/SPV source.

Q. When the feasibility or approval granted to the consumers...

Q. When the feasibility or approval granted to the consumers for installing the plant?

  1. Divisional/Engineer (Operations) shall conduct a feasibility analysis within 15 working days of the receipt of completed application form.
  2. Based upon feasibility study, approval shall be granted to the consumer for installation of solar roof top system.

 

 

Q. What is the installation cost of a roof top solar PV syst...

Q. What is the installation cost of a roof top solar PV system?

The cost of the system varies with the capacity and proximity to connect to the grid system which ranges approximately Rs.1, 10,000/ KWp.

Q .What is the minimum requirement to install solar rooftop ...

Q .What is the minimum requirement to install solar rooftop systems to avail Net Metering facility?

1. A 3 phase (415Volts) supply service connection from DISCOMs.  However, consumer with a single phase supply service connection is also eligible for up to 3KW capacity.

2. A minimum vacant roof top area of 10 Sq. meter or 100 Sq. ft per1KilloWatt peak (KWp) of solar power generation  preferably of RCC (if not, roof strength is to be assessed to install PV modules).

    3. In case of an inclined roof with inclination towards south is preferred for maximum output.

Q. What are the steps involved in installing roof top solar ...

Q. What are the steps involved in installing roof top solar power plant?

Step 1: Eligibility

A consumer who has a three phase connection and a vacant roof top are eligible. However, consumer with single phase supply service connection is also eligible for up to 3KW capacity. Depending upon the roof space and investment capability, consumer has to decide the capacity to be installed.   

Step 2: Application

The consumer has to apply for technical feasibility for installing the roof top solar power plant to the local Divisional Engineer (Operations). The application form should be duly filled and registration fee of Rs.1000 + service tax charges in the form of Demand Draft in favor of respective DISCOM is to be submitted at respective CSE/ICSE.

Step 3: Technical feasibility

The concerned Divisional Engineer (Operations) along with Divisional engineer (M&P) will conduct feasibility analysis of distribution transformer within 15 working days of the receipt of completed Application Form.  

Based upon feasibility study, approval shall be granted to the consumer for installation of solar roof top system. The consumer shall enter into agreement (executed on Rs. 10/- non-judicial stamp paper) with respective DISCOM in the prescribed format. The approval shall contain maximum permissible capacity of the SPV system and is valid till 6 months from the date of approval.

Step 4: Approaching the vendor:

After getting technical feasibility & approval, the consumer can approach approved vendors. As per the vendors experience, pricing and other factors, the consumer has to select a vendor for installing the roof top solar power plant in a turnkey approach.

Step 5: Inspection of equipment:

After the installation of rooftop solar power plant the consumer has to request Divisional Engineer (Operations) for inspection of installed equipment. The Divisional Engineer (Operations) & Divisional Engineer (M&P) shall see that all their safety and standard criteria are met.

Step 6: Installation and Calibration of Net meter:

After conducting inspection of the equipment of SPV system, the Divisional Engineer (Operations) shall make necessary arrangement for installation, calibration and sealing of bi-directional meter.

Step 7: Synchronization of SPV system:

After installation of Net meter, the Divisional Engineer (Operations) shall make necessary arrangements for synchronization of SPV system within 10 working days, provided the systems are installed as per the norms and standards.

Step 8:  Excess power generated can be fed into Grid:

Power generated through solar roof top system is utilized for self consumption and if any excess power is generated can be fed into the grid through net meter and the excess power fed to the grid will be paid to the consumer at a pooled cost in a half yearly  basis.

Net meter will record the net import or export to the grid.

Q. What are the advantages of solar roof top system?

Q. What are the advantages of solar roof top system?

ADVANTAGES

  1. Utilization of vacant rooftop for power generation.
  2. Can generate power for self consumption and feed excess power to the Grid.
  3. Payback arrangement for the excess power fed to the grid.
  4. Generation of environmental friendly green energy.
  5. Uninterrupted power supply during day time.
  6. Reduction in diesel consumption where DG back-up is provided.
  7. Capital subsidies from Govt. of India and Govt. of A.P/Telengana.

 

Q. What is roof-top solar system?

Q. What is roof-top solar system?

Solar system arranged on the roof-top to generate power for self consumption and to feed surplus (excess) power to the grid.

If you have any queries please write to us info@epowerone.com or post here.

Password Assistance